References

Company References

2018

  • Akzo Nobel Finland Oy. CW-80 Rerouting of rainwater and cooling water The delivery included approximately 300 meters of acid-proof piping dn 15-200. The work went well and was completed on schedule.
  • Akzo Nobel Finland Oy. Protective cover for a waste water well KS-69. The delivery included special materials such as titanium, acid-proof PE100, PVC, and PVC+LM piping, as well as a plastic protective cover. SKM Service completed the contract with flying colours and without accidents.
  • Valmet Technologies Stora Enso Heinola. Power increase project of Stora Enso’s soda recovery unit. SKM participated in the project by installing piping and equipment.
  • Kuopion Energia Oy’s Kumpusaari oil rock storage project. The contract consisted of piping, equipment installation and steel structure work. The delivery included approximately 450 meters of acid-proof piping with fittings, a loading station for a tanker lorry, and piping insulation. In addition, SKM delivered construction-technical work for the whole.
  • Empower in/TVO Olkiluoto, OL1. Prefabricated piping and installation during shutdown, also including pump installation and alignment. Piping related to precooling and aftercooling of the reactor. The work went well, as concerns both the quality and schedule.
  • SSAB Raahe plant. Annual contract work around the plant.
  •  SSAB Raahe plant, Blast furnace 1. SKM carried out tubing installation of sections of the cooling staves of Blast furnace 1. The work was completed on schedule and with excellent quality.
  • SSAB Raahe plant, replacing compressed-air piping and compressor. SKM Service will supply new pressurised-air piping and installs the related actuators.  The contract includes approximately 2 kilometres of acid-proof piping with fittings, and all the valves. SKM Service is known for its quality, and in this project we will use an orbital welding machine to weld the seams, although this is not a requirement. In all likelihood, the contract will be finished in April, 2019.
  • Raahen Voima Oy. Maintenance work 2018
  • Outokumpu Stainless Oy, Tornio plant. SKM took part in the annual maintenance of the steel mill. Our work consisted of replacement work of the abrasion resistant plates of the conveyor, replacement of piping, steel structure work, and modernizing the ladle rotating device. In addition, we made NDT checks in a number of different places. The work was completed on schedule, safely, and to the satisfaction of the customer.
  • Outokumpu Chrome Oy, Kemi mine. Survey for the need of maintenance and replacement of dust-removal piping of crushed gravel in 2018.
  • Finnsementti Oy, maintenance work. SKM carried out maintenance work during 2018.
  • Agnico Eagle Finland,  Kittilä gold mine.SKM Service supplied the mine with pigging equipment of pipes.  The delivery included the design of the equipment, CE markings, electrification, automation, and instructions for use.
  • Yara Siilinjärvi. Numerous maintenance tasks, and plastics-related projects.
  • Mondi Powerflute Oy. Numerous maintenance tasks, and plastics-related projects, such as replacing the sanitary sewage line.
  • Mondi Powerflute Oy. Installing a new mass pump for the homogenization tower and the related new piping.
  • Mondi Powerflute Oy. Replacement of the DN400 untreated water line.
  • Kensapuu Oy Himanka. SKM Service installed new sawdust vacuum equipment and the associated piping. The piping is PE 160 plastic piping.
  • YIT Suomi Oy Espoo, Blominmäki wastewater treatment plant. SKM started deliveries to the Blominmäki wastewater treatment plant in late summer, 2018. The delivery has included lead-through parts, service manholes, and pipelines installed. SMS Service Oy and SKM Stainless Oy will continue deliveries to the site in question for the forthcoming years.
  • Borealis
    • Polypropylene plant, installation of shell tubes
    • Aromate production, shutdown 2018, dozens of minor repair tasks of pipelines
    • Olefine production, piping change in the wetflare tank
    • Olefine production, analyser lines
    • Steel structures (RST) of the sampling well
    • Maintenance work supervision and control
  • Valmet Finland.  A gas purification and sealing system for the MarBio project in Vantaa, piping, platforms, and Scrubber repairs, materials: Superduplex, Duplex, 316L,
  • Valmet Sweden
    • SCA Östrand plant
      • Piping installation on the fibre line and “Punch” team
      • On the fibre line, Head Supervisor, Piping Supervisor, Scaffold Supervisor, Insulation Supervisor, electricians
      • In the evaporator unit, Head Supervisor, Piping Supervisor, Scaffold Supervisor, 40 piping mechanics, and work management
  • Weir Minerals Netherlands b.v. Compressed-air tank and pipelines modifications in the concentrating sand treatment plant of Yara Suomi at Siilinjärvi.
  • LKAB Minerals Oy. Maintenance work
  • Lujabetoni Oy. Maintenance work, plastics work
  • Savon Sellu Oy
    • Shutdowns
    • Cooling water line and condensation water line
    • Work on the homogenization pump
  • Vantaan Energia Oy. Installation of lye lines, installation of chemical lines, factory water, installation of district heat pipelines, installation of hydrochloric acid lines, platform installation and modifications, steel structure work. 

2017

  • Kraton Chemical Oy, Oulu plant. Replacement of thermal oil pumps as part of annual service.
  • Main Partner/Kraton Chemical Oy, Oulu plant. Replacement of sealant fluid tanks. Installation of a total of four tanks and their related pumps, exchangers and pipework.
  • HK Scan Rauma. SKM installed a vacuum system and related pipework and equipment for the production unit at HK Scan Rauma plant.
  • Mesmec Oy HK Scan Rauma. SKM installed working platforms and cooling equipment for the production unit at HK Scan Rauma.
  • Meyn Food Processing Technology B.V. HK Scan Rauma. SKM installed conveyor equipment and steel structures for the production unit.
  • LINCO FOOD SYSTEMS A/S. HK Scan Rauma. SKM installed conveyor equipment, fans and other equipment needed in production.
  • SSAB Raahe plant. Modernisation of DQ Equipment for the plate mill. The delivery by SKM included large volumes of acid-resistant pipework, working platforms, steel structures and valves. In the project, the Q&T unit was dismantled nearly in its entirety and its hydraulics, water and instrumentation pipework and hull structures renewed. The installation was demanding and on a very tight schedule, carried out around the clock with two truck cranes and some 30 technicians. SKM delivered excellent quality on time and without incidents.
  • SSAB Raahe plant. Replacement of scale breaker pipework for the hot strip mill. The pipe material was P355N 355,6x30mm. The work consisted of dismantling of old piping, installation of new pipework, NDT inspections and heat treatments. The work was excellent in quality and delivered on time and without incidents.
  • SSAB Raahe plant. Replacement of intercooling water pipework for the hot strip mill. Material 1.4432 size classes 33.7-610mm. Delivery consisted of pipe materials, valves and steel structures. The work was delivered ahead of schedule with excellent quality and safety.
  • SSAB Raahe plant replacement of cooling towers (three towers). SKM replaced three cooling towers as part of annual service of the hot strip mill.  The work was carried out by some 60 persons and a truck crane, and was completed three days ahead of schedule in highly demanding winter conditions.
  • SSAB Raahe plant. Various routine maintenance work for the plant.
  • Outokumpu Stainless Oy Tornio plant. SKM took part in the annual service for the steel mill. Our work consisted of e.g. replacement of abrasion resistance plates of conveyors, renewal of pipework, steel structure works and replacement of the converter protective wall. The work was completed on schedule, safely and to the satisfaction of the customer.
  • Outokumpu Chrome Oy, Kemi mine, maintenance of dedusting system for the crushing plant and materials development
  • Outotec Oyj, wear-resistant prefabricated pipework products 
  • Woikoski Oy H2 Analysis pipework and instrumentation Kokkola. SKM delivered and installed analysis instrumentation and pipework for the Woikoski plant in Kokkola. The delivery included connection of a bottling station and precision steel pipework from 6mm.
  • Finnsementti Oy maintenance work. SKM carried out various maintenance tasks and signed a new three-year framework agreement for maintenance and repairs to continue years of good cooperation.
  • Raahen Voima Oy. Numerous maintenance work in accordance with the framework agreement. 
  • Caverion Corporation, Metsä Fibre bioproduct mill construction site in Äänekoski, SKM performed site and installation supervision and documentation tasks
  • Borealis Polymers Oy, pipework repairs and projects during TA2017 large-scale downtime, carried out by some 100 personnel on a tight schedule during the stoppage, including installations, NDT inspections and documentation, with hundreds of individual PED folders. Documentation was completed 2 days after the last seam was welded. Maintenance supervision tasks and supervision during the downtime
  • Avoputki Oy, Resources for projects and downtimes
  • Hjelmco Oil Ab, Västerås, Pipework for the kerosene terminal
  • Neste Jacobs, Supervision tasks during the Naantali large-scale downtime
  • Valmet Ab, Supervision and installation tasks for the SCA Sundsvall expansion project. Pipework installations carried out by approx. 20 technicians / welders over the autumn. In addition, SKM supplied 10 personnel for the installation of electric trace heating cables.
  • Empower IN/TVO Olkiluoto, OL2 prefabricated pipework and installation during downtime, including pump installations and lining. Reactor pre and post-cooling, replacement of exchangers, including pipework modifications.
  • Hanhikivi 1 Pyhäjoki, Maastorakentajat / Titan-2 equipment and pipework installation for temporary water pumping station
  • Yara Suomi Siilinjärvi maintenance work. SKM Service performed maintenance tasks during the year in various plants and the mine in Siilinjärvi. The maintenance included both metal and plastic works. SKM also took part in the annual downtime at Siilinjärvi plants (mine, fertilizer plant, sulfuric acid and phosphoric acid plants).
  • Yara Suomi Siilinjärvi sulfuric acid plant cooling water pipeline. SKM delivered and installed a new DN600 cooling water pipeline for the sulfuric acid plant and dismantled the old pipework. Total length of new pipework was approx. 180m. The pipeline material was acid-resistant steel.
  • Yara Suomi Oy, Siilinjärvi plant, Maintenance agreement on tasks with hourly rate
  • Powerflute Oy. SKM Service carried out numerous maintenance tasks in the pulp mill. Including replacements/repair of pipework and various installation tasks. Installed expansion of compressed air pipework for the machine repair shop and took part in the annual plant downtime.
  • Terrafame. Delivery of chemical steam pipework.
  • Mondo Minerals. Installation and prefabrication of joint grooves for fibreglass tanks.
  • Stora Enso, Sunila plant. SKM Service carried out installation of new condensers for the Sunila plant and dismantled old condensers.

2016

  • Marimatic. Assembly of waste collection point in Kruunuvuori.
  • Arizona Chemicals, Renewal of fuel supply pipework and equipment installations. The project consisted of tank equipment, pump installations and acid-resistant pipework.
  • Arizona Chemicals, Renewal of distillery pumps and pipework during summer downtime.
  • Arizona Chemicals, Supervision of construction of a new, 7000m3 tall oil tank
  • Finnsementti Oy, Maintenance work.
  • Outokumpu Chrome Kemi Mine, Maintenance of dedusting system pipework for the crushing plant, thickness measurements of hard-coated parts with twin probe. SKM is responsible for the supervision of the entire dedusting pipework for the crushing plant and for its development to improve resistance against wear.
  • Outotec Finland, Delivery of pipework and equipment installations for the Yara Siilinjärvi mine tailings processing plant.
    The delivery by SKM Service included pipework materials, prefabrication, painting, installation, pipeline and tank insulation, pump, tank and plant unit installation, valve installation, support structure welding work and installation. Pipework alone consisted of approx. 3 km of pipeline. The project also included the installation of some of the largest pumps in the world (3 pumps of 150 tonnes each).
    Some 30-40 of our personnel took part in the site operations.
    SKM Service experienced no on-site incidents leading to employee absences. All tasks were completed on schedule.
  • Outotec Finland, Installation and outfitting of heavy-duty thickeners for the Yara Siilinjärvi mine tailings processing plant. SKM Service carried out the outfitting of thickeners included in the Outotec delivery, including the installation of scarifiers, axles, bridges, surfaces, machine units, pickets and feed systems. The thickeners were approx. 30 metres in diameter and 20 metres in height.  No incidents leading to employee absences occurred during the work. 
  • Outotec Turula, Machine shop welding and installation work.
  • Raahen Voima, Installation of pipework and equipment for the new power plant.
  • Raahen Voima, Maintenance work.
  • SSAB, Routine annual maintenance work.
  • SSAB Raahe plant, SKM Service Oy took part in the annual service for the hot strip mill. A total of some 60 personnel from SKM participated. The feedback received from the customer was very positive, and the work was completed ahead of schedule and without incident.
  • Stora Enso Oulu plant, Installation of PK6 steam compressors. During the summer downtime, SKM installed a new steam supply system for the dryer section. Some 30 personnel worked around the clock on the installations, and the work was completed in five days.
  • Yara Suomi Oy, Siilinjärvi, Annual service of fertilizer plant, attended by some 20 technicians as well as supervisors.
  • Yara Suomi Oy, Siilinjärvi, Annual service of the mine. SKM participated in the annual service of the mine with some 40 personnel. The work included repairs of cracks in the grinding mill, including project planning from work methods up to implementation. Several replacements of pipework and equipment installations.
  • Borealis Polymers Oy, Maintenance supervision tasks and planning of TA2017 production downtime
  • Borealis Polymers Oy, Train loading overhead line, manufacture of SW line and other maintenance work
  • Hjelmco Oil Ab, Västerås, Pipework and equipment installation of new kerosene tanks
  • Oy Forssa-Engineering Ab, Pipework for large storage tanks installed by Forssa-Engineering in Oulu and Sandarne, Sweden
  • Arme Oy / Armesteel Oy, Installation and welding work for tanks in Äänekoski, Timrå and Västerås
  • Yara Siilinjärvi, Pipework project for a new sulfuric acid tank and installation of tank area service pipelines.
  • Yara Siilinjärvi, Various pipelines and components for the fertilizer plant. (Low-pressure steam pipeline, high-pressure washing pipeline, etc.)
  • Yara Siilinjärvi, Mine, fertilizer plant, phosphoric acid plant, sulfuric acid plant: plastic piping, lining works, installation of special wells.
  • Ekokem, Pipework welding work, wells.
  • Savon Sellu, PAC chemical pipework.
  • Sibelco Nordic, Sulfuric acid line and plastic pipeline installation.

2015

  • Borealis Polymers, NaOh pipeline Supply, 2015
  • Borealis Polymers, Turnaround 2015, Small repairs, Pipeline repairs, Valve exchange works, Tank repairs, Reactors Plates repair works, Close to 50 professional from SKM execute the works, 2015
  • Borealis Polymers, Sulphurid Acid pipeline supply, 2015
  • Borealis Polymers, Cable Tray, Supply and Installation, 2015
  • Neste Jacobs, Supervisor Services at Neste Oils Turnaround, 2015
  • Outokumpu Chrome Oy, Kemi Mine, Crusher Units Dust Removal Pipelines Supply, Pipes made of Our supply UltraPlate 4000 Chromium Carbide Plate, Supply includes design, prefabrication, demolishing old ones, installation, material supply and selection, 2015
  • Outokumpu Stainless, Supply of district heat pipelines, and freshwater pipelines, at our services also includes coordinations of other projects services, 2015
  • Power Flute, Savo Pulp, Maintenance works, Fabrications and installation of Wood Chips Feeder, material Ultra Plate 3000, 2015
  • SSAB Smeltering Plant Dust removal pipeline supply, 2015
  • SSAB Blastfurnacegas water blocks replacement, supply includes tanks and pipelines, 2015
  • SSAB Pulverized Coal Injection Plants Propanegasline supply, 2015
  • SSAB Coke oven plants, biounits steelpipes change works to plastic, 2015
  • SSAB Coke oven plants, Blasfurnace gaslines passing lines supply, Size Dn800, 2015
  • SSAB Tank Areas, Firewater pipelines supply, 2015
  • SSAB Pressure air booster pipeline supply, 2015
  • SSAB Maintenance works 2015
  • Raahen Voima, New Power stations low pressure steamline supply, 2015
  • Raahen Voima, New Power stations firewater pumpingstations supply 2015
  • Raahen Voima, Maintenance works 2015
  • Prepipe Oy, Pipe installations at Kaukas, Joutseno and Uimaharju paper & pulp plants, 2015
  • UPM Kaukas, Supply and installation of Blowdown tank, 2015
  • Finncement, Raahe, Blastfurnace slags loading structures supply, Supply including erection was done according to EN 1090-2, 2015
  • Marimatic, Vantaa, Kivistö, Municipal waste treatment plants supply, including pipelines and mechanical installation, 2015
  • Yara, Siilinjärvi, Ammonium and Sulhuric acid pipelines, According to G-module, 2015
  • Yara, Siilinjärvi, Ammonium loading place modifications according to G-Module, 2015
  • Yara, Siilinjärvi, Sulphurid acid plants, gas pipeline Dn1800 modifications, supplys includes prefabrication, engineering, design and erection, 2015
  • Yara Siilinjärvi, Teeterwaterline pump installation, pipeline modifications and supply of new lines, 2015
  • Yara, Siilinjärvi, Firewater and freshwater lines supply, 2015
  • Yara, Siilinjärvi, liguid gas pipelines supply, 2015
  • Yara, Siilinjärvi Mines, Yearly Turnaround works, over 30 workers supplys and coordination of work, 2015

2014

  • Avo-Putki Oy, Joutseno, UPM Luna projects pipeline installations and weldings
  • Borealis Polymers Oy, Kilpilahti, Supervisor Services, Installation of NaOh pipelines, Repair of pipelines, installation of support structures
  • Finncement, Raahe, Maintenances Projects
  • Prepipe Oy, Lappeenranta, pipeline installations and weldings
  • Kuusakoski Oy, Heinola, Liquid Gasline installtions and weldings
  • Outokumpu Chrome Oy, Kemi Mine, Supply and installation of pipelines made of wera plates 2014
  • Ruukki Metals, Raahe, Change of blastfurnace gasholders (size of seal n.120 m x14m)
  • Ruukki Metals, Raahe, Coke oven Plant, Supply of NaOh pipeline
  • Ruukki Metals, Raaahe, Coke Oven Plant, Supply of hood
  • Ruukki Metals, Raahe, Coke Oven Plants, heat exhangers change work, icluding new pipings
  • Raahen Voima, Supply of waterlines, Pipe Size Dn1400, Dn1200, Dn700, Dn225, material plastic and steel
  • Simetek Oy, Yara Suomi Oy, Siilinjärvi Plant, Supply of Phosphorus acid pipelines, material 904
  • Yara Suomi Oy, Siilinjärven Plant, KJA pipeline, Size Dn400, material 904L
  • Yara Suomi Oy, Siilinjärven Plant, Supply of cooling waterlines, Size dn500, material 1.4432
  • Yara Suomi Oy, Siilinjärven Plant, Installations of ammonium acid filter including new pipings, according to PED G-module
  • Yara Suomi Oy, Siilinjärven Plant, Propane gaslines
  • Yara Suomi Oy, Siilinjärven Plant, Emergency Shower Pipelines
  • Yara Suomi Oy, Siilinjärven Plant, FS 189 Pressure line,Size Dn150 material 904L
  • Yara Suomi Oy, Siilinjärven Plant, FHT Cleaning line, Size Dn125 material 904,
  • Yara Suomi Oy, Siilinjärvi Mine, Overpass pipeline, Size Dn500/Dn700 P235GH, PEH560 Installation and welding,
  • Yara Suomi Oy, Siilinjärven Mine, At autums rewamp supplied wear plate prefabrications like, pipes, Y-branches, pipings, wells etc. Our supply includes demolitions of old parts and installation of new ones,
  • Ruukki Metals, Raahe, Coil Mills summer turnaround
  • Ruukki Metals, Raahe, Plate Mills summer Turnaround
  • Ruukki Metals, Raahe, Maintenance contracts hourly based services

2013

  • Ruukki Metals, Raahen, Coke gas enrichment for blast furnace 2, supply included installation of blowers, gaspipelines, gassteamlines, instrumentlines and other equipments,
  • Ruukki Metals Oy,Coke Oven Plant, Revamp of Coke oven gasholders Waterlock
  • Marimatic Oy, Helsinki, Installations at Malmi Hospital,
  • Borealis Polymers Oy, Porvoo, Firefight pipelines revamp, Size dn250/300, Nitrogen pipelines installations,  
  • Yara, Suomi Oy, Siilinjärvi Plant, Installtions of PEH pipelines, Size dn20-dn280,
  • Avo-Putki Oy, Lappeenranta, Hydrogen plants pipelines prefabrication and installations
  • Konecranes Service Oy, Yaran Siilinjärvi Mine, Crane tracks installations,
  • Arme Oy, Norja, LNG Tanks Platforms installations
  • Ruukki Metals Oy, Raahe, Pressure Air pipelines installations
  • Yara Suomi Oy, Siilinjärvi Mine, Autumn Turnaround, Installation of Dn350/450 wear Plate  pipelines installations,
  • Borealis Polymers Oy, Porvoo, Maintenance Services,
  • Nordic Mines Oy, Laivakangas Mine, Supply of prefabricated wear plate parts and pipes
  • Nordic Mines Oy, Laivakangas Mine, Autumn Turnaround, Maintenance works
  • Nordic Mines Oy, Laivakangas Mine, Grinding Mills, Revamp works
  • Ruukki Metals Oy, Raahe, Revamp of Firefight pipelines
  • Marimatic Oy, Tampere, Installations of Muncipal waste treatment plant,
  • Yara Suomi Oy, Siilinjärvi, Installation of water cooling pipelines,
  • Borealis Polymers Oy, Supervisor Services